Renewable Energy – Solar Technology

North Power Company and its professional staff have been actively involved in the implementation of numerous engineering projects, particularly in the field of renewable energy—focusing on solar technology. This includes solutions for solar photovoltaic systems and solar water heating, all aimed at advancing infrastructure development. Details of these projects are listed below, and further information can be provided upon request.

Completed Projects

https://npciraqdiskstorage.blob.core.windows.net/projectimage/ee7ddcdb-c14d-422a-bcee-7e528203ca17.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/9d497481-926f-4736-b0e2-ab755c908570.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/a056bf6f-74fc-45b9-8cad-5205b736ab41.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/0ef8b52a-d45e-4416-9844-cab33de907aa.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / Kirkuk Site . We have successfully installed, tested and energized a 200.1 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound, located in Kirkuk Regional Office, Iraq. This advanced system features a 100 KW PV inverter in a three-phase configuration, a 204.6 KWh Battery Energy Storage System, and a 100 KW Power Conversion system. The system comprises 348 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Four (4) 50KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, 204.6KWh (102.3kWh Capacity/ Rack * 2 battery rack, total 204.6KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS100K-A; Max. DC input voltage 1000V, DC voltage range (500V Dc to 900VDc), Rated AC output power 100KW, Rated output voltage 400V AC, Max. output current 159A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 20 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:

Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/fc850762-037e-40bb-96d9-79d85af29c8d.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/8bea8785-4c62-4346-b0f4-bd1a2b3acf3c.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/91dcef2e-27c0-4b07-beb6-f1ab94a26951.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e14bacba-2e3f-49d9-b95c-9837c0c9b556.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / Erbil Site . We have successfully installed, tested and energized a 400.2 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound, located in Erbil Regional Office, Iraq. This advanced system features a 375 KW PV inverter in a three-phase configuration, a 483 KWh Battery Energy Storage System, and a 250 KW Power Conversion system. The system comprises 696 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Three (3) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, 483KWh (96.6kWh Capacity/ Rack * 5 battery rack, total 483KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS250K-A; Max. DC input voltage 1000V, DC input voltage range (500V Dc to 900VDc), Rated AC output power 250KW, Rated output voltage 400V AC, Max. output current 397A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 42 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/5b8ee0e6-a9c2-410d-88f8-db58f29e0aea.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e266fc0c-6a0b-48be-8ec0-922d15d3c1f5.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/dd895a80-6d8e-47a7-bd96-b79d5d9552f2.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/50212282-5320-4762-8c9f-81eb86f3e9ce.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / BIAP Site . We have successfully installed, tested and energized a 100 KWp ground mounting Solar PV Hybrid Microgrid System at the UNAMI Compound, located in BIAP, Baghdad International Air Port-Iraq. This advanced system features a 100 KW PV inverter in a three-phase configuration, a 306.9 KWh Battery Energy Storage System, and a 250 KW Power Conversion system. The system comprises 174 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: One (1) 100KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, (102.3KWh Capacity/ Rack * 3 battery rack, total 306.9KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS250K-A; Max. DC input voltage 1000V, DC voltage range (500V Dc to 900VDc), Rated AC output power 100KW, Rated output voltage 400V AC, Max. output current 397A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units. • PV DC Combiner Box: 10 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/e42173ea-f2a0-41b8-9ec4-81d3040051e3.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/8ee679bb-e7b9-4550-b5a7-40d6045ff8e7.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/6ff4f629-efeb-4ea3-93b9-85338cd883a0.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/8ef95a14-de40-465d-bb65-b6e49fa58a7b.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / Villa Site . We have successfully installed, tested and energized a 100 KWp rooftop and carport mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in Villa, Baghdad-Iraq. This advanced system features a 100 KW PV inverter in a three-phase configuration, a 102.3 KWh Battery Energy Storage System, and a 100 KW Power Conversion system. The system comprises 174 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings and Car parking Structure. Key components of this installation include: • On-Grid PV Inverter: Two (2) 50KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, 102.3KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS100K-A; Max. DC input voltage 1000V, DC voltage range (500V Dc to 900VDc), Rated AC output power 100KW, Rated output voltage 400V AC, Max. output current 159A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units. • PV DC Combiner Box: 11 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/a52655c9-1802-415b-a4cf-ffb58e7ad5cc.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/883a1091-a9c1-43dc-a379-537ccd1a042e.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/95cd5f5c-c0a3-4bd9-a0af-e7e9aa26479c.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/cd99f9a9-5a40-43ef-9e45-920bd4380896.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / Tamimi Site . We have successfully installed, tested and energized a 400.20 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in Tamimi, Baghdad-Iraq. This advanced system features a 375 KW PV inverter in a three-phase configuration, a 483 KWh Battery Energy Storage System, and a 250 KW Power Conversion system. The system comprises 696 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with U-Chanel support structure. Key components of this installation include: • On-Grid PV Inverter: Three (3) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, 483KWh (96.6kWh Capacity/ Rack * 5 battery rack, total 483KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS250K-A; Max. DC input voltage 1000V, DC input voltage range (500V Dc to 900VDc), Rated AC output power 250KW, Rated output voltage 400V AC, Max. output current 397A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units. • PV DC Combiner Box: 42 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/27550d91-7902-462a-a742-a9192f778dff.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/254343a0-6458-4822-9b73-1dfd60fdff36.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/4ccfd9cd-e8e0-460d-b427-509cd7ad1709.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/f4ae3f27-5745-40a9-bcbe-30cb3a49e506.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / Diwan Site . We have successfully installed, tested and energized a 350.10 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in Diwan, Baghdad - Iraq. This advanced system features a 375 KW PV inverter in a three-phase configuration, a 716 KWh Battery Energy Storage System, and a 250 KW Power Conversion system. The system comprises 609 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Three (3) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System PowerCube-M2A-180 Up to 1000VDC, 716KWh (102.3KWh Capacity/ Rack * 7 battery rack, total 716KWh capacity battery bank including BMU, BMS, HMI, battery combiner panel with fuses, battery cables and all accessories and fittings), • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS250K-A; Max. DC input voltage 1000V, DC input voltage range (500V Dc to 900VDc), Rated AC output power 250KW, Rated output voltage 400V AC, Max. output current 397A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 36 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/e2b8038e-e653-400a-9b01-32564121be07.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/be72f03d-3a4c-4976-8a16-06f141b44983.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/a9ae2191-9953-4558-9464-86d96bc9f84f.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/630efda6-d97f-4f22-843f-a9d667584794.jpg


Name of Project / Kind of Works:
UNAMI - PV Project / D2 Site . We have successfully installed, tested and energized a 650.325 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in D2, Baghdad - Iraq. This advanced system features a 625 KW PV inverter in a three-phase configuration, a 1080 KWh Battery Energy Storage System, and a 500 KW Power Conversion system. The system comprises 1,131 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Five (5) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System (PowerCube-M2A-180), with a total capacity of 1,080 KWh (108 KWh per rack, across 10 battery racks), including BMU, BMS, HMI, battery combiner panel with fuses, battery cables, and all necessary accessories, • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS500K-A, with a max DC input voltage of 1000V, DC input range of 500V-900V, rated AC output power of 500 KW, and max output current of 794A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 69 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
Total Value of the Contract:

Duration:

Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/97a08816-9e5d-41cf-9c5d-03bde87f6c82.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/395e722b-35e0-450b-94a6-5d246aecf1a0.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/f53bf9b7-ca0d-40e6-b245-a6a99e25f89a.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/63dc9843-0394-46c9-b294-e467eba0ef85.jpg


Name of Project / Kind of Works:
Turnkey project, which includes a 2.22MWp solar power system and a 3.379MWh Battery Energy Storage System (BESS) . We, at North Power Company, are pleased to announce the successful completion of our turnkey project, which includes a 2.22MWp solar power system and a 3.379MWh Battery Energy Storage System (BESS). This comprehensive project involved the design, engineering, manufacturing, and delivery of equipment, along with civil, mechanical, and electrical installation works. It also included the testing, commissioning and energizing of seven PV solar farms (Solar PV Hybrid Microgrid Systems) in grid-connected and off-grid configurations across seven UNAMI locations in Iraq—five in Baghdad and two in Erbil and Kirkuk regional offices. Additionally, we upgraded and expanded the existing Solar PV Systems at UNAMI premises. To meet the specific requirements of this project, North Power Company delivered an integrated solution that includes a Power Plant Controller. This System Effectively manages the PV plant, BESS, Genset and National Grid power, based on load demand. The system ensures optimal control, monitoring, visualization, and analysis of solar PV power generation, BESS, Genset and national grid. The operational philosophy behind the Solar PV Hybrid Microgrid System is to maximize renewable energy use, reduce carbon footprints, and maintain reliability and stability. The Energy Management and Control System (EMCS) is central to this philosophy, enabling smooth transitions between power sources and effective energy utilization. It plays a critical role in managing the complex microgrid network and interactions between various power sources, ensuring a balanced, efficient, and sustainable energy supply. This approach optimizes energy efficiency and minimizes operational costs by leveraging different power sources based on real-time price and availability, thereby enhancing overall economic performance.
Total Value of the Contract:
4,165,386.70 USD
Duration:
486 Calendar days
Commencement Date:
03/03/2023
Completion Date:
15/07/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/cee20bb7-8f86-48a8-991e-10a781892d11.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/6640c67b-d29f-4bcb-94fe-471d40bc93df.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/ecc22067-6102-42da-8f32-b369336c1d57.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/1b3dbbbb-e030-4dd1-b800-b0863b164752.jpg


Name of Project / Kind of Works:
Design, engineering and installation phases of the PV solar carport structures project to accommodate a total capacity of 213 KWp
Total Value of the Contract:
343,373.93 USD
Duration:
5 months
Commencement Date:
12/12/2023
Completion Date:
26/04/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Assistance Mission for Iraq (UNAMI)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the site, carrying out site civil, mechanical and electrical installation works, testing and commissioning.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/8d98cbbd-1c9f-4aa5-831c-9079c08208a0.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/b22b8c4b-c132-49a1-a4ee-d8713787cf6b.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/8f2bf15c-8aff-4719-9a4b-735cb5f26b6a.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/b660bcfc-a449-404b-9219-eda4e2f16bc1.jpg


Name of Project / Kind of Works:
47KWp rooftop solar photovoltaic hybrid system at the UNFPA-Anbar Women Shelter in Iraq, featuring a 45kVA 3-phase configuration with 30kWh energy storage
Total Value of the Contract:
112,407.00 USD
Duration:
3 months
Commencement Date:
23/01/2024
Completion Date:
21/04/2024
Status of Project Completion:
100%
Contracting Authority and Location:
United Nations Population Fund for Iraq (UNFPA)
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, engineering services, delivery of equipment and materials to the site, carrying out site civil, mechanical and electrical installation works, testing, commissioning and energizing of 3Ph, Solar Photovoltaic Hybrid System roof top mounting type.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/32e5b79f-09f0-4e8e-8858-ac07ab3d9397.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/b52c8596-2eaa-40ee-9de4-e017afbb1e0c.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/41df8d28-4b92-4644-af50-7c9b1826eeb9.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e36c0d5b-3f42-4312-b9fe-d5593d7e2f99.JPG


Name of Project / Kind of Works:
Ground Mounted 3Ph 90kVA with 128KWh Energy Storage Solar PV Hybrid System constructed at Harruta Station Site of United Mix Media for TV Broadcasting Services. Installed PV capacity is 91.16KWp with 1728*530 Wp Longi PV Module , Mounting Structure, 6X Victron Inverter/Charger Model Quattro 48/15000/140, 230V, 15kVA , 13X Victron MPPT Solar Charger Controller Model 4500/100, DC Busbar, Victron Color Control GX and Touch Gx for local and online monitoring and setting screen, BYD Energy Storage Battery Bank LVS (128 KWh) Lithium-ion Battery with Power Distribution Unit (PDU), Battery Management System (BMS), SOLARLAND DC Combiner Box, Electrical System Distribution Board, AC, DC & Communication Cables, Cable Trays, earthing system and all accessories and fittings.
Total Value of the Contract:
237,198.00
Duration:
3 month
Commencement Date:
20/08/2022
Completion Date:
20/11/2022
Status of Project Completion:
100%
Contracting Authority and Location:
United Mix Media For TV Broadcasting Services
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning and Energizing of the System.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/b20163c3-a201-47f7-ba1f-5e37bab0d0b1.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/a5d63c3f-3ece-4a67-b03e-78303a7dc837.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/f43ed7b1-d024-4a2b-97ed-19fba91d241b.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/d86b37db-bcf1-45ab-8cb9-4722c3b29642.jpg


Name of Project / Kind of Works:
Roof top mounted 30kVA, 3Ph with 30KWh Energy Storage Solar PV Hybrid System constructed at company office building. Installed PV capacity is 28.08KWp with 108*260 W Solarland PV Module , Mounting Structure, 3X Victron Inverter/Charger Model Quattro 48/10000/140, 230V, 10kVA , 6X Victron MPPT Solar Charger Controller Model 250/100, Victron Lynx DC Busbar, Victron Color Control GX for local and online monitoring and setting screen, BYD Energy Storage Battery Bank LVS Flex (30 KWh) Lithium-ion Battery with Power Distribution Unit (PDU), Battery Management System (BMS), SOLARLAND DC Combiner Box, Electrical System Distribution Board, AC, DC & Communication Cables, Cable Trays, earthing system and all accessories and fittings.
Total Value of the Contract:
66,250USD
Duration:
90 days
Commencement Date:
01/08/2022
Completion Date:
25/11/2022
Status of Project Completion:
100%
Contracting Authority and Location:
North Power Company Ltd.
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning and Energizing of the System.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/bd6ab0e8-d259-4cd2-9430-eaab423fb281.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/ec28e3eb-dabf-478f-a8c7-88e4626d39e0.jpeg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/a572148e-1372-4f42-808b-44d7ab864822.jpeg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/80ebadd2-8074-4e01-8e36-499a3405c6b7.jpeg


Name of Project / Kind of Works:
Roof top mounted Hybrid Photovoltaic System. The total installed PV capacity at the site is 10.9KWp, with 20X545W Trina Solar Modules, Mounting Structure, Victron Inverter/Charger Model Quattro 48/10000/140-100/100, 230V, 10kVA, two Victron MPPT Solar Charger Controller Model 250/100, Victron Lynx DC Busbar, Victron Color Control GX for local and online monitoring and setting screen, BYD Energy Storage Battery Bank LVS 12 (24 KWh) Lithium-ion Battery with Power Distribution Unit (PDU), Battery Management System (BMS), SOLARLAND DC Combiner Box, Electrical System Distribution Board, DC & Communication Cables, Cable Trays, earthing system and all accessories and fittings.
Total Value of the Contract:
25,319.00 USD
Duration:
7 days
Commencement Date:
23/05/2022
Completion Date:
01/06/2022
Status of Project Completion:
100%
Contracting Authority and Location:
United Mix Media TV– Safin Station Site
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Service, Procurement, Delivery, Installation, Testing, Commissioning and Energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/617297f2-0b30-4c77-9e76-3a38454938ce.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/386412f2-309b-4958-97b1-5114cbc24aa4.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/075db8e8-fc7c-4f08-b578-dad06d773dbb.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/ecc50588-c6f3-474c-80fd-c13a080fbd4b.jpg


Name of Project / Kind of Works:
Roof top mounted Grid Tie Systems. The total installed PV capacity at the site is 16.2KWp with 30X540W JA Solar Modules, SMA Sunny Tripower 20000TL PV Inverter, Protection and Fuse Elements, three SMA Sunny Island 8.0H -13 Battery Inverter, BYD Energy Storage Battery Bank LVS 12 (36 KWh) Lithium-ion Battery with Power Distribution Unit (PDU), Battery Management System (BMS), Solarland DC Combiner box, Electrical System Distribution Board, DC & Communication Cables, Cable Trays, earthing system and all accessories and fittings.
Total Value of the Contract:
56,997.00 USD
Duration:
15 days
Commencement Date:
15/03/2022
Completion Date:
31/03/2022
Status of Project Completion:
100%
Contracting Authority and Location:

Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning and Energizing of the System.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/81ed3ae2-a101-403e-bdfa-4338e922c309.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/5d0da66b-3d01-425a-8336-7e8c2c1ad08b.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/c9e5a8de-df0e-4eb0-a916-b7837cc83e24.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/83964c8b-8792-416d-a14d-8e0f416f1102.JPG


Name of Project / Kind of Works:
United Mix Media TV– Khalakan Station Site Ground mounted Off-Grid Photovoltaic System. The total installed PV capacity at the site is 8.7KWp, with 16X545W Trina Solar Modules, Mounting Structure, Victron Inverter/Charger Model Quattro 48/10000/140-100/100, 230V, two Victron MPPT Solar Charger Controller Model 250/100, Victron Lynx DC busbar, Victron Cerbo GX and Touch Gx for local and online monitoring and setting screen, BYD Energy Storage Battery Bank LVS 12 (36 KWh) Lithium-ion Battery with Power Distribution Unit (PDU), Battery Management System (BMS), SUNTREE SHLX-PV2/1 DC Combiner Box, Electrical System Distribution Board, DC & Communication Cables, Cable Trays, earthing system and all accessories and fittings.
Total Value of the Contract:
35,972.00 USD
Duration:
15 days
Commencement Date:
01/03/2022
Completion Date:
15/03/2022
Status of Project Completion:
100%
Contracting Authority and Location:
United Mix Media Sulaymaniyah City – Khalakan Site
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Service, Procurement, Delivery, Installation, Testing, Commissioning and Energizing.


https://npciraqdiskstorage.blob.core.windows.net/projectimage/7d5b3f88-b846-4662-b72f-8f3063c48dc4.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/1dc836f1-fecb-44c1-97d8-632e11402078.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/cda93e08-cc7e-4fbf-b10c-76f74877d920.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/1a960e3b-4d85-4d77-b40d-cbd3ba64f2e7.JPG


Name of Project / Kind of Works:
Supplying, Installation, Testing and Commissioning of 300L Solar Water Collector
Total Value of the Contract:
670.00 USD
Duration:
3 days
Commencement Date:
03/06/2022
Completion Date:
03/06/2022
Status of Project Completion:
100%
Contracting Authority and Location:
private sector - Real State - Sulaimaniyah Hills
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Supplying, Installation, Testing and Commissioning of 300L Solar Water Collector


https://npciraqdiskstorage.blob.core.windows.net/projectimage/9156a17d-ad09-4f16-9c9f-eb3cbaec38d7.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/cb28e9e4-2c13-4fde-94d6-bdcc9c05d533.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/67448b59-73d4-4604-8b4a-385daca3f107.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/179e474a-1c87-4649-92f4-ff189ead039f.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 18,720Wp, with 72X260W solar modules, 6X5kVA inverters and 72X500Ah,2V VRLA Battery from Solarland.The expected electricity yield is approximately 40 MWh/ year.
Total Value of the Contract:
44,500.00 USD
Duration:
15 days
Commencement Date:
01/02/2020
Completion Date:
10/02/2020
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/23042096-91e8-47e8-9c26-8d5c4a0d9bc1.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/654bf33a-3761-4072-bdb8-4d9be2070039.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/d69e63a3-f8ca-4208-900e-921f7f1b9665.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e2fb0402-ade0-4ba5-9486-fbea35551513.jpg


Name of Project / Kind of Works:
Supplying, Installation, Testing and Commissioning of 300L Solar Water Collector
Total Value of the Contract:
640 $
Duration:
3 days
Commencement Date:
14/02/2020
Completion Date:
16/02/2020
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Supplying, Installation, Testing and Commissioning of 300L Solar Water Collector


https://npciraqdiskstorage.blob.core.windows.net/projectimage/3d1fed0a-866b-49a7-8319-e020bc87af72.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/d65ed383-5a87-4560-aa05-657c00f7a463.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/d9bb8a09-d96a-43bd-88f4-acef6527bd17.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/dbb4fe86-a4ab-4451-9305-ba527b1eee03.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 3,120 Wp, with 12X260W solar modules, 1X5kVA inverter and 8X120Ah,12V VRLA Battery from Solarland. The expected electricity yield is approximately 6.73 MWh / year.
Total Value of the Contract:
6,000.00 USD
Duration:
3 days
Commencement Date:
12/07/2019
Completion Date:
14/08/2019
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/dcfeb5a8-dc7f-410e-a29b-0bcef8baf46a.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/2861804b-0be3-4bb7-a952-ea931217c162.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/66b102ed-bf14-439b-81e7-c70bf45a6615.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/07eb3240-d18d-477c-a8be-d86358565638.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 6,050Wp with 22X275W solar modules from Q-cell, 6X5kVA inverters from Solarland and 15KW energy storage battery bank from BYD. The expected electricity yield approximately is 13 MWh / year.
Total Value of the Contract:
8,150.00 USD
Duration:
3 days
Commencement Date:
01/05/2019
Completion Date:
10/05/2019
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/6d351a19-c35e-42df-9bcc-11677680aaeb.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/3a7971f7-c459-4454-aedb-3a63b57c8ce3.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/fb616d09-adf3-4ab0-bf26-cf1b242ad35f.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/ef2afa81-fde0-4375-87ec-61d4612713f0.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 900 Wp, with 6X150W solar modules, 1X3kVA inverters and 2X200 Ah VRLA Battery from Solarland. The expected electricity yield approximately is 1.9 MWh / year.
Total Value of the Contract:
2,000.00 USD
Duration:
2 days
Commencement Date:
29/10/2018
Completion Date:
31/10/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/984e3518-e045-4fe0-82e2-172e8ef4c394.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/3e6835a3-ae8a-45e0-ae4d-a047bbce4f80.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/67775d86-53ee-4e28-8b67-3bb6c6e41004.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/5077dab2-c8f0-4a40-ac13-a3a87c17d011.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 3,120 Wp, with 12X260W solar modules, 1X5kVA inverter and 8X120Ah VRLA Battery from Solarland. The expected electricity yield isapproximately 6.73 MWh / year.
Total Value of the Contract:
5,700.00 USD
Duration:
3 days
Commencement Date:
09/09/2018
Completion Date:
12/09/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/a1e97856-2692-47b2-b5f0-a364f5a1bb1d.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/9bf31500-7f41-4b9e-8990-7943ac2638c0.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/f9fcd483-ef64-4249-803d-cace0c487900.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/b1cfa314-fbe4-42ff-aed4-dc9141bfbe64.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 3,120 Wp, with 12X260W solar modules, 1X5kVA inverter and 8X120Ah VRLA Battery from Solarland. The expected electricity yield isapproximately 6.73 MWh / year.
Total Value of the Contract:
5,700.00 USD
Duration:
3 days
Commencement Date:
03/09/2018
Completion Date:
05/09/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/31a14aab-a230-418c-9168-90f9d9798a43.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e0bcc59d-dfcf-4279-b948-5276f90a5a97.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/232b5412-62ee-4325-a291-ce270bda634d.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/109d4c73-624e-4406-a2f1-c327494ca1b8.jpg


Name of Project / Kind of Works:
Ground Mounted Type Off -Grid Photovoltaic system. The total installed PV capacity is 3,640 Wp, with 14X260W solar modules from Solarland, 1X80A MPPT solar charger controller from Bluesun. The expected electricity yield is approximately 7.86 MWh / year.
Total Value of the Contract:
4,905.00 USD
Duration:
7 days
Commencement Date:
01/07/2018
Completion Date:
07/07/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Gorran Net Co. - Aween city Site - Tanjaro area
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/6ab0ad31-8bf9-4cf4-a034-a1bd90f67225.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/3023817e-01b9-491d-8b44-79803c9b5367.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/f892de41-eb27-4dac-acfe-8b101a201c0f.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/beda2b40-9426-4041-82b8-ef215a6ee72a.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 3,640 Wp, with 14X260W solar modules, 1X5kVA inverter and 4X120Ah,12V VRLA Battery from Solarland. The expected electricity yield is approximately 7.86 MWh / year.
Total Value of the Contract:
6,280.00USD
Duration:
7 days
Commencement Date:
10/07/2018
Completion Date:
17/07/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Gorran Net Co. - Qwlaraysi Site - Qwlaraysy area
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/dd78287a-4b32-4875-b9f7-221dbb1211c8.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/72d132da-0bef-4d8f-b149-b8e156e14bf8.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/5cd2eaa5-09ef-41de-9f4b-6230a6bd55fc.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/78252592-34e9-4edc-8411-5aed0a210854.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 3,120 Wp, with 12X260W solar modules, 1X5kVA inverter and 8X120Ah,12V VRLA Battery from Solarland. The expected electricity yield is approximately 6.73 MWh / year.
Total Value of the Contract:
5,700.00 USD
Duration:
3 days
Commencement Date:
25/06/2018
Completion Date:
27/06/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/3d5a8c4b-1518-4ce9-af30-bd2c617c6d63.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e9f29b28-4591-4d87-9642-d17baa3280bd.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/bfa4b4a4-845c-46f8-ac12-7f1c6a718196.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/74cbf782-b595-4b72-ad24-be594ec4a05e.jpg


Name of Project / Kind of Works:
Ground Mounted Type Off-Grid Photovoltaic system. The total installed PV capacity is 6,240 Wp, with 24X260W solar modules, 2X5kVA inverters and 24X500Ah,2V VRLA Battery from Solarland. The expected electricity yield approximately is 13.47 MWh / year.
Total Value of the Contract:
13,000.00 USD
Duration:
6 days
Commencement Date:
09/04/2018
Completion Date:
14/04/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/29d8b813-17d5-45d7-a9a1-b6fba71f2016.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/e37d452b-61ad-45b7-abfe-c002470a5939.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/2de4a5c7-08d4-4da0-a523-d7f82c9a06df.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/6e73695f-0bf3-41eb-8338-ba875437a35e.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 6,240 Wp, with 24X260W solar modules, 2X5kVA inverters and 24X500Ah,2V VRLA Battery from Solarland. The expected electricity yield approximately is 13.47 MWh / year.
Total Value of the Contract:
13,000.00 USD
Duration:
6 Working Days
Commencement Date:
24/02/2018
Completion Date:
28/02/2018
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


https://npciraqdiskstorage.blob.core.windows.net/projectimage/7602c2aa-1b88-465f-9b0c-865f87aa7bb7.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/15f9a280-7508-476f-b3d3-cf6fc007c17d.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/697c141e-980b-44d1-9e5d-a4cee4b74dcb.JPG

https://npciraqdiskstorage.blob.core.windows.net/projectimage/1869c09f-5154-4f3e-a597-8f2c7fe4e907.JPG


Name of Project / Kind of Works:
16 (All in Two Type) Solar Street Lights for Arbat and Ashti Refugee Camps
Total Value of the Contract:
17,600.00 USD
Duration:
2 weeks
Commencement Date:
01/12/2017
Completion Date:
15/12/2017
Status of Project Completion:
100%
Contracting Authority and Location:
Qandil Organization / Hasuna Co.
Prime Contractor (P) or Subcontractor (S):
S
NPC Responsibility:
Design , Delivery , Installation , Testing and Commissioning of 16 Street Lights


https://npciraqdiskstorage.blob.core.windows.net/projectimage/f0c3c13c-9fc3-41a6-a7d9-a7ef2f064c10.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/d23aa04c-d6ce-4dd2-9a3b-3a11d317e7bf.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/94b7f33f-0fe5-4b18-b36b-ac2cbd409136.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/73ce31bc-1273-4d7a-960b-3fae4b167d04.jpg


Name of Project / Kind of Works:
Supplying, Installation, Testing and Commissioning of 360L Solar Water Collector
Total Value of the Contract:
330 USD
Duration:
1 day
Commencement Date:
10/09/2018
Completion Date:
10/10/2017
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Supplying, Installation, Testing and Commissioning of 360L Solar Water Collector


https://npciraqdiskstorage.blob.core.windows.net/projectimage/22bcc727-4f61-49f0-8e9a-8555b6e2d528.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/c8b239ae-4a64-439c-94b5-e763ee772d64.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/c2d612ae-4cbc-4ce7-8fd0-db0491f5b101.jpg

https://npciraqdiskstorage.blob.core.windows.net/projectimage/39ab3a38-82b2-4f21-a05f-ef2fbe085e9d.jpg


Name of Project / Kind of Works:
Roof-Top Type Off-Grid Photovoltaic system. The total installed PV capacity is 6,240 Wp, with 24X260W solar modules, 2X5kVA inverters and 24X500Ah,2V VRLA Battery from Solarland. The expected electricity yield approximately is 13.47 MWh / year.
Total Value of the Contract:
13,000.00 USD
Duration:
3 days
Commencement Date:
01/10/2017
Completion Date:
06/10/2017
Status of Project Completion:
100%
Contracting Authority and Location:
Domestic Consumer
Prime Contractor (P) or Subcontractor (S):
P
NPC Responsibility:
Design, Engineering Services, Supplying, Installation, Testing, Commissioning, Energizing of the System


Ongoing Projects

© Copyright 2011 - 2024 NPC - All Rights Reserved

Designed & Developed by WAN Co.